Creating a Frame

To create a frame

  1. In AcuityLogic Admin, click Product, select Frames, and then select Frames.
  2. Complete the following fields:
    Field NameDescriptionRequired

    Frame Fields

     

     

    Collection

    The collection to which the frame belongs.

    The drop-down list is linked from Product > Frames > Frame Collection.

    X

    Style

    The style name of the frame.

    The drop-down list is linked from Product > Frames > Style.

    X

    Frame Part

    The part of the frame (for example, Bridge or Clip). If this a complete frame, select Complete.

    The drop-down list is linked from Master Data Admin > Item Categories > Frame Part.

    X

    Frame Color

    The color of the frame.

     

    Frame Color FamilyThe general color family (Blue, Gray, etc.) for the frame color. 

    Eye

    The size of the eye (the horizontal width of the frame’s lens, usually 40 to 60 mm).

    X

    Bridge

    The size of the bridge.

    X

    Temple

    The size of the temple.

    X

    Wholesale Cost

    The wholesale cost.

    X

    A Meas

    The A measurement (the horizontal width of the lens’s box measurement).

    X

    B Meas

    The B measurement (the vertical height of the lens’s box measurement).

    X

    Ed Meas

    The effective diameter measurement (two times the longest radius from the center of the lens).

    X

    Db Meas

    The distance-between-lenses measurement.

    X

    Bin Number

    Leave this field blank. It does not have functionality at this time.

     

    Item Fields

     

     

    Item Name

    The item name.

    As a naming convention, use the following field entries to create item names:

    <Style> <Frame Color> <Eye>/<Bridge>/<Temple>

    For example, an item name might be the following:

    Adam Brown 52/18/140.

    X

    Item Number

    The item number.

    X

    Item Type

    The type of item. Frames automatically appears.

     

    UPC Code

    The UPC code. Type the frame's correct UPC code to ensure an accurate VSP calculation. If the frame has no UPC code, record the frame item number, but note that VSP then considers the frame a non-Marchon/Altair frame when calculating benefits.

    This code appears on the label.

    X

    Item Status

    The status of the frame.

    This field is used in reports.

     

    Default Cost

    The price that you paid for the frame.

     

    Average Cost

    The average cost of the frame for your company. The average cost is also displayed in the Inventory Lookup window in AcuityLogic DC. See Reviewing Inventory Transactions in AcuityLogic DC.

    Note: This field appears only if your company uses the average cost by company inventory valuation method. The inventory valuation method is set up in the Company Information window. See Setting Up Company Information.

     

    Show Office Detail

    Link that enables you to see the inventory and cost details for the frame at all office locations. This information is also displayed in the Inventory Lookup window in AcuityLogic DC. See Reviewing Inventory Transactions in AcuityLogic DC.

     

    Supply Source

    The supply source. The options are

    • DC: If a frame is sold, a replenishment is created and added to the pick list for the distribution center.
    • DC if Available: If inventory reflects the quantity on hand, the frame is added to the pick list from the distribution center. If you have none on hand at the distribution center, it is added to a vendor pick list.
    • Vendor: Anything from the distribution center is ordered from the vendor.

    The drop-down list is linked from Master Data Admin > Miscellaneous > Item Supply Source.

     

    Active

    If selected, the frame is active in inventory.

     

    Allow Zero Price

    If selected, enables users to invoice the item with no price or to change the price to $0.00 when working on a customer sale.

     

    Item Group

    The group to which the frame belongs.

     

    Section Number

    The location of the frame in the distribution center. The section number appears on the stock pick list generated for stock orders in AcuityLogic DC.

     

    Price Change Date

    The date that the price was changed.

    This field is not used in reports.

     

    Status Change Date

    The date that the status was changed.

    This field is not used in reports.

     

    Date Added

    The date that the frame was added to the system.

    This field is not used in reports.

     

    Financial Group

    The financial group assigned to the item. See Maintaining Financial Groups.

     

    Item Custom Attributes

     

     

    Package

    If Eyefinity configured a custom attribute tied to the frame, select the attribute if necessary.

     

    Product Mapping Fields  
    Item Status

    The status of the frame for the company.

    This status takes precedence over the item-level Item Status in the Item Fields section of the Frame Edit window.

    But this status is overwritten by the office-level Item Status in the Assign Frame to Office window.

    When a frame has more than one item status in the company, this field is set to Multiple.

     
    Offices

    Link that opens the Assign Frame to Office window, where you can set item status by office. See Setting the Status and Availability of Frames by Office.

     
    Include

    If selected, the frame is visible (available) to all the offices in your company.

    If not selected, the frame is hidden (unavailable) to all the offices in your company.

    The Include check box in the Assign Frame to Office window takes precedence over this check box.

     
  3. Click Save.
  4. To add a vendor for the frame:
    1. From the grid of frames, click the Vendors link for the frame.
    2. Click Add Vendor.
    3. Under the Vendor column, select a vendor from the drop-down list.

      To add a new vendor, see Adding and Modifying Vendors.

    4. Enter the cost that the vendor charges you for the item.
    5. Click Insert.
    6. Click Return.
  5. Use the Map Partners link to add partner codes if necessary.

    See Adding Partner Codes for Frames.

  6. Use the Frames link to add images if necessary.

    See Adding Images for Frames.

  7. Use the Pricing link to add pricing if necessary.

    See Adding and Changing Pricing for Frames.

Related Topics